Hi @SaintSovereign,
Thank you for your reply, but I’m not sure I understand the instruction.
You would follow the same schedule, just within the washout periods for ZPU.
Does this mean I follow the new instruction’s schedule (30 days of listening days, or approximately 60 calendar days as mentioned in the new instruction), or follow the 21 day cycle as mentioned in the old Zero Point Stack Rotation instruction (following the link you provided)?
Also, if the instruction is to follow the 21 day cycle, do we only count the listening days as mentioned in the new instruction manual, or do we also count rest days when counting the 21 day cycle?
For example, let’s say the schedule was
day 1: listen
day 2: rest
day 3: listen
If we were to follow the new instruction manual’s counting method, it would count as only 2 days, but if we were to also include rest days, it would be 3 days.
Which is correct? 2 days? 3 days?