Hey everybody. Quick question. What is the protocol for switching out one program in a 3 Sub stack mid cycle? I was running Executive Emperor with RICH and Genesis Ascension stage 2.
I was running Ascension on A days and RICH/EE on B days. I want to switch out Executive Emperor for the new Khan Black Stage 1 and run Ascension/RICH on A days and Khan Black 1 on B days. How long should I wait between stopping EE and starting KB1?
I was planning on 12 days. I stopped EE on 10/13, and I’ve already moved RICH over to A days with Ascension, leaving a few hours in between each to avoid overload.
Would 12 days be enough time to let EE fully integrate? Can I start KB 1 sooner than that?